SC3-600 March 2000 Part No. 25001301 Direct Drive Fluid Coolers Installation and Maintenance Data Table of Contents Inspection System Warranty I
* “W” = Total width of the fluid cooler.unit. If these requirements are not met, unit must be installed as indicated for “Units in pits”. Fences must
Following our careful inspection of the returned part and if it is determined that the failure is due to faulty material orworkmanship, credit will be
Sterling, Inc. 2900 S. 160th Street New Berlin, WI 53151 262-641-8610 y Fax: 262-641-8653 www.sterlco.com
Inspection Responsibility should be assigned to a dependable individual at the job site to receive material. Each shipment should be carefully checke
Figure 1. Rigging Instructions. similar distance should be maintained between adjacent units. Sufficient free area should be left around and below un
Table 1. Fluid Cooler Internal Volume and Weight Fluid Cooler Fan Configuration Number of Fans Number of Rows Internal Volume Gallons Approximate Net
5 Double Row of Fans Single Row of Fans Diagram 1. Typical Fluid Cooler Wiring Diagram Without Fan Cycle Controls.
Double Row of Fans Single Row of Fans Diagram 2. Typical Fluid Cooler Wiring Diagram With Standard Fan Cycle Controls. 6
7 System Installation NOTE: All installation and maintenance are to be performed only by qualified personnel who are familiar with local codes and
Table 4. Percentage of Ethylene Glycol to be Added by Volume. Percent % 20% 30% 40% 45% 50% Minimum Outside Design Temperature °F +15 -3 -14 -23
Start-up 1. Prestart: Check for correct dry cooler fan rotation. This can be done by quickly jogging the fan contactor. Be sure that the fans run fre
Comments to this Manuals