SSE 5 BLSafety instructions 2-12. Safety instructions These safety instructions apply to all persons within the range ofaction of the equipment.Pleas
SSE 5 BLSafety instructions 2-22.1. For your safety2.1.1. GeneralThe operating personnel of this equipment must be at least 16 years old.Please read
SSE 5 BLSafety instructions 2-32.1.2. AssemblyCompare the connected loads with those of the mains supply. Danger of injury through electricalshock!Whe
SSE 5 BLSafety instructions 2-42.1.3. OperationAppoint an equipment foreman to be responsible for the equipment.Ensure that the operating personnel ar
SSE 5 BLSafety instructions 2-52.2. For the operating safety of the equipmentNever change settings if the consequences are not precisely known.Use on
SSE 5 BLPutting into operation 3-13. Putting into operation This chapter is intended for operating personnel.Prerequisite for this chapter is general
SSE 5 BLPutting into operation 3-23.1. Checking the pipe systemRemove the flexible hose from the connected material takeup.Close the open end of the h
SSE 5 BLPutting into operation 3-33.2. Adjusting the suction pipesThe suction pipes have to be adjusted exactly to ensure troublefree operation.1. Se
SSE 5 BLPutting into operation 3-43.3. Setting the controllerF The filling capacity of the hopper loader may not exceed thematerial inlet.& The s
SSE 5 BLPutting into operation 3-5Setting the line clear timePress the “change-over” key andthen the “arrow key”.& The line clear time which was l
SSE 5 BL2Sterling Material Processing5200 West Clinton Ave.Milwaukee, WI 53223Telephone: (414) 354-0970Fax: (414) 354-6421www.sterlco.comTechnical ser
SSE 5 BLError and error correction 64. Error and error correction This chapter is intended for the operating personnel of theequipment.Prerequisite f
SSE 5 BLError and error correction 7If a disturbance occurs in the unit, an alarm message will be issued (option, only if the alarmindicating device h
SSE 5 BLMaintenance 85. MaintenanceThis chapter is intended for persons with skills in electrical andmechanical areas due to their training, experienc
SSE 5 BLMaintenance 9F Please observe the maintenance intervals.Before starting maintenance work, clean the equipment of oil, fuelor lubricants.Ensure
SSE 5 BLMaintenance 105.1. Maintenance intervalsDaily: Check warning signs on equipment for good legibility and completenessClean the filter: Use co
SSE 5 BLMaintenance 11Figure 0: Installation sealing ring5.2.1. Changing the sealing ring of the outlet flapRemove the connecting plug “flap switch” (
SSE 5 BLMaintenance 125.2.2. Adjusting the flap switchRemove the connecting plug “flap switch”from the connection housing of the hopper.Connect an ohm
SSE 5 BLMaintenance 135.2.3. Cleaning the unitOpen the toggle-type fasteners (A).Fold the hopper lid with turbine upwards.Remove the filter (B).Clean
SSE 5 BLMaintenance 14Open the toggle-type fasteners (A) and the flap(B) of the hopper loader.Check the filter cloth (C) and the wire cloth (D)for mat
SSE 5 BLFunctional description 156. Functional description This functional description is intended for all operating personnelof the equipment.Prere
SSE 5 BL3Sterling Material Processing retains all rights to change the information in these operatinginstructions at any time without notice.We assume
SSE 5 BLFunctional description 166.1. GeneralThe single conveyor unit functions according to the principle ofsuction conveyance. A high-performance t
SSE 5 BLFunctional description 176.2. ControllerThe control system is mounted on the separator lid.The setting for the conveying time and the line cle
SSE 5 BLFunctional description 18If a material clearing valve has been installed residues of flowing material will be cleaned from theconveying line d
SSE 5 BLTransport, Assembly and Storage 197. Transport, Assembly and Storage This chapter is intended for all operating personnel of theequipment.Per
SSE 5 BLTransport, Assembly and Storage 207.1. Transport and Packing Please ensure adequate carrying capacity of the liftingequipment.The equipment p
SSE 5 BLAssembly instructions 218. Assembly instructions These installation instructions are intended for persons withskills in electrical and mechan
SSE 5 BLAssembly instructions 228.1. AssemblyThe single conveyor unit is insensitive to shocks and can bemounted directly onto the processing machine
SSE 5 BLAssembly instructions 23Mounting on fixed machine throats or intermediate containers is done by means of strapretainers.Please check during as
SSE 5 BLAssembly instructions 248.2. Mounting on the processing machineA material hopper VT 2,3/70 / VT 2,8/70 is required:Mount the material hopper
SSE 5 BLAssembly instructions 258.4. Mounting onto mixing hoppers with lateral inletA material hopper VT 2,3/70/VT2,8/70 is required:Mount the materi
Please note that our address and phone information has changed. Please reference this page for updated contact information. These manuals are obsolet
SSE 5 BLAssembly instructions 268.6. Material feedSuction pipes type MV may be tilted by approx. 45 degrees in either direction to the vertical.Addit
SSE 5 BLAssembly instructions 278.8. PipeworkIf PVC hoses are used for conveying, they must be grounded: draw out the copper lead on bothends of the
SSE 5 BLAssembly instructions 288.9.1. Installation of the “flap switch” signal lineInsert the appliance plug of the “flap switch” signal line into th
SSE 5 BLAssembly instructions 298.9.3. Installation of the alarm indicating device (optional) This work must be carried out by qualified personnel on
SSE 5 BLAssembly instructions 308.10. Compressed-air supplyFor operating the cleaning device, a compressed-air supply is necessary.Check compressed-a
SSE 5 BLTechnical data 319. Technical data These instructions apply to all persons within the range of actionof the equipment.These operating instruc
SSE 5 BLTechnical data 32SSE 5/BLBasic Version• Integrated control with:- LED-display- indication of the respective modes of operation- adjustable c
SSE 5 BLTechnical data 33Dimension SheetDimensions and data without obligations. Specifications may be subject to alterations.
SSE 5 BLSpare parts list 3410. Spare parts list This spare parts list is intended to be used only by trainedpersonnel.Other persons are not permitte
SSE 5 BLSpare parts list 35SSE-f/BL, 230 V, 50 Hz
SSE 5 BL4Table of contents1. 1. General instructions...1-11.1.
SSE 5 BLSpare parts list 3610.1. SSE-5/BL, 230 V, 50 HzPos. Order no. Designation Wear Code1 S38217 Turbine lid with turbine, complete 82995 Turbine
SSE 5 BLSpare parts list 3710.2. AccessoriesF Please observe the operating manuals in chapter 11.
SSE 5 BLAccessories 3811. Accessorieso _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _o _ _ _ _ _ _ _ _ _ _ _ _ _
SSE 5 BLElectrical manual 3912. Electrical manual This electrical manual is intended to be used only by Sterlingservice personnel and trained person
SSE 5 BLElectrical manual 40
SSE 5 BLElectrical manual 41
SSE 5 BLElectrical manual 42
SSE 5 BLElectrical manual 43
SSE 5 BLElectrical manual 44
SSE 5 BLElectrical manual 45
SSE 5 BL58.9.1. Installation of the “flap switch” signal line ... 288.9.2. Installation of the signal line o
SSE 5 BLElectrical manual 46
SSE 5 BLElectrical manual 47
SSE 5 BLGeneral instructions 1-11. General instructions These instructions apply to all persons within the range of actionof the equipment.These oper
SSE 5 BLGeneral instructions 1-21.1. Warnings and symbolsThe following warnings and symbols are used in these operating instructions: This symbol ind
SSE 5 BLGeneral instructions 1-31.2. Explanations and informationVarious terms and designations are used in these operating instructions to ensure cl
Comments to this Manuals