Sterling SSE-5 User Manual

Browse online or download User Manual for Welding System Sterling SSE-5. Sterling SSE-5 User's Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 61
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Sterling Material Processing
Operating Instructions
Single Conveyor Unit
SSE-5 BL
Page view 0
1 2 3 4 5 6 ... 60 61

Summary of Contents

Page 1 - SSE-5 BL

Sterling Material ProcessingOperating InstructionsSingle Conveyor UnitSSE-5 BL

Page 2

SSE 5 BLSafety instructions 2-12. Safety instructions These safety instructions apply to all persons within the range ofaction of the equipment.Pleas

Page 3

SSE 5 BLSafety instructions 2-22.1. For your safety2.1.1. GeneralThe operating personnel of this equipment must be at least 16 years old.Please read

Page 4

SSE 5 BLSafety instructions 2-32.1.2. AssemblyCompare the connected loads with those of the mains supply. Danger of injury through electricalshock!Whe

Page 5 - Table of contents

SSE 5 BLSafety instructions 2-42.1.3. OperationAppoint an equipment foreman to be responsible for the equipment.Ensure that the operating personnel ar

Page 6

SSE 5 BLSafety instructions 2-52.2. For the operating safety of the equipmentNever change settings if the consequences are not precisely known.Use on

Page 7 - 1. General instructions

SSE 5 BLPutting into operation 3-13. Putting into operation This chapter is intended for operating personnel.Prerequisite for this chapter is general

Page 8 - 1.1. Warnings and symbols

SSE 5 BLPutting into operation 3-23.1. Checking the pipe systemRemove the flexible hose from the connected material takeup.Close the open end of the h

Page 9 - 1.5. Notes on usage

SSE 5 BLPutting into operation 3-33.2. Adjusting the suction pipesThe suction pipes have to be adjusted exactly to ensure troublefree operation.1. Se

Page 10 - 2. Safety instructions

SSE 5 BLPutting into operation 3-43.3. Setting the controllerF The filling capacity of the hopper loader may not exceed thematerial inlet.& The s

Page 11 - 2.1. For your safety

SSE 5 BLPutting into operation 3-5Setting the line clear timePress the “change-over” key andthen the “arrow key”.& The line clear time which was l

Page 12 - 2.1.2. Assembly

SSE 5 BL2Sterling Material Processing5200 West Clinton Ave.Milwaukee, WI 53223Telephone: (414) 354-0970Fax: (414) 354-6421www.sterlco.comTechnical ser

Page 13 - 2.1.4. Maintenance

SSE 5 BLError and error correction 64. Error and error correction This chapter is intended for the operating personnel of theequipment.Prerequisite f

Page 14 - SSE 5 BL

SSE 5 BLError and error correction 7If a disturbance occurs in the unit, an alarm message will be issued (option, only if the alarmindicating device h

Page 15 - 3. Putting into operation

SSE 5 BLMaintenance 85. MaintenanceThis chapter is intended for persons with skills in electrical andmechanical areas due to their training, experienc

Page 16 - 3.1. Checking the pipe system

SSE 5 BLMaintenance 9F Please observe the maintenance intervals.Before starting maintenance work, clean the equipment of oil, fuelor lubricants.Ensure

Page 17 - Putting into operation 3-3

SSE 5 BLMaintenance 105.1. Maintenance intervalsDaily: Check warning signs on equipment for good legibility and completenessClean the filter: Use co

Page 18 - 3.3. Setting the controller

SSE 5 BLMaintenance 11Figure 0: Installation sealing ring5.2.1. Changing the sealing ring of the outlet flapRemove the connecting plug “flap switch” (

Page 19 - 3.5. Switching off the unit

SSE 5 BLMaintenance 125.2.2. Adjusting the flap switchRemove the connecting plug “flap switch”from the connection housing of the hopper.Connect an ohm

Page 20 - 4. Error and error correction

SSE 5 BLMaintenance 135.2.3. Cleaning the unitOpen the toggle-type fasteners (A).Fold the hopper lid with turbine upwards.Remove the filter (B).Clean

Page 21

SSE 5 BLMaintenance 14Open the toggle-type fasteners (A) and the flap(B) of the hopper loader.Check the filter cloth (C) and the wire cloth (D)for mat

Page 22 - 5. Maintenance

SSE 5 BLFunctional description 156. Functional description This functional description is intended for all operating personnelof the equipment.Prere

Page 23

SSE 5 BL3Sterling Material Processing retains all rights to change the information in these operatinginstructions at any time without notice.We assume

Page 24 - 5.2. Servicing the conveyor

SSE 5 BLFunctional description 166.1. GeneralThe single conveyor unit functions according to the principle ofsuction conveyance. A high-performance t

Page 25 - Maintenance 11

SSE 5 BLFunctional description 176.2. ControllerThe control system is mounted on the separator lid.The setting for the conveying time and the line cle

Page 26 - & Order numbers

SSE 5 BLFunctional description 18If a material clearing valve has been installed residues of flowing material will be cleaned from theconveying line d

Page 27 - & Order number

SSE 5 BLTransport, Assembly and Storage 197. Transport, Assembly and Storage This chapter is intended for all operating personnel of theequipment.Per

Page 28

SSE 5 BLTransport, Assembly and Storage 207.1. Transport and Packing Please ensure adequate carrying capacity of the liftingequipment.The equipment p

Page 29 - 6. Functional description

SSE 5 BLAssembly instructions 218. Assembly instructions These installation instructions are intended for persons withskills in electrical and mechan

Page 30 - 6.1. General

SSE 5 BLAssembly instructions 228.1. AssemblyThe single conveyor unit is insensitive to shocks and can bemounted directly onto the processing machine

Page 31 - 6.2. Controller

SSE 5 BLAssembly instructions 23Mounting on fixed machine throats or intermediate containers is done by means of strapretainers.Please check during as

Page 32 - Functional description 18

SSE 5 BLAssembly instructions 248.2. Mounting on the processing machineA material hopper VT 2,3/70 / VT 2,8/70 is required:Mount the material hopper

Page 33

SSE 5 BLAssembly instructions 258.4. Mounting onto mixing hoppers with lateral inletA material hopper VT 2,3/70/VT2,8/70 is required:Mount the materi

Page 34 - 7.3. Storage

Please note that our address and phone information has changed. Please reference this page for updated contact information. These manuals are obsolet

Page 35 - 8. Assembly instructions

SSE 5 BLAssembly instructions 268.6. Material feedSuction pipes type MV may be tilted by approx. 45 degrees in either direction to the vertical.Addit

Page 36 - 8.1. Assembly

SSE 5 BLAssembly instructions 278.8. PipeworkIf PVC hoses are used for conveying, they must be grounded: draw out the copper lead on bothends of the

Page 37 - Figure 5: Assembly

SSE 5 BLAssembly instructions 288.9.1. Installation of the “flap switch” signal lineInsert the appliance plug of the “flap switch” signal line into th

Page 38

SSE 5 BLAssembly instructions 298.9.3. Installation of the alarm indicating device (optional) This work must be carried out by qualified personnel on

Page 39

SSE 5 BLAssembly instructions 308.10. Compressed-air supplyFor operating the cleaning device, a compressed-air supply is necessary.Check compressed-a

Page 40 - 8.6. Material feed

SSE 5 BLTechnical data 319. Technical data These instructions apply to all persons within the range of actionof the equipment.These operating instruc

Page 41 - 8.9. Electrical connection

SSE 5 BLTechnical data 32SSE 5/BLBasic Version• Integrated control with:- LED-display- indication of the respective modes of operation- adjustable c

Page 42 - Assembly instructions 28

SSE 5 BLTechnical data 33Dimension SheetDimensions and data without obligations. Specifications may be subject to alterations.

Page 43

SSE 5 BLSpare parts list 3410. Spare parts list This spare parts list is intended to be used only by trainedpersonnel.Other persons are not permitte

Page 44 - F See chapter “Accessories”

SSE 5 BLSpare parts list 35SSE-f/BL, 230 V, 50 Hz

Page 45 - 9. Technical data

SSE 5 BL4Table of contents1. 1. General instructions...1-11.1.

Page 46 - Technical data 32

SSE 5 BLSpare parts list 3610.1. SSE-5/BL, 230 V, 50 HzPos. Order no. Designation Wear Code1 S38217 Turbine lid with turbine, complete 82995 Turbine

Page 47 - Technical data 33

SSE 5 BLSpare parts list 3710.2. AccessoriesF Please observe the operating manuals in chapter 11.

Page 48 - & Wear Code:

SSE 5 BLAccessories 3811. Accessorieso _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _o _ _ _ _ _ _ _ _ _ _ _ _ _

Page 49 - Spare parts list 35

SSE 5 BLElectrical manual 3912. Electrical manual This electrical manual is intended to be used only by Sterlingservice personnel and trained person

Page 50 - 10.1. SSE-5/BL, 230 V, 50 Hz

SSE 5 BLElectrical manual 40

Page 51 - 10.2. Accessories

SSE 5 BLElectrical manual 41

Page 52 - 11. Accessories

SSE 5 BLElectrical manual 42

Page 53 - 12. Electrical manual

SSE 5 BLElectrical manual 43

Page 54 - Electrical manual 40

SSE 5 BLElectrical manual 44

Page 55 - Electrical manual 41

SSE 5 BLElectrical manual 45

Page 56 - Electrical manual 42

SSE 5 BL58.9.1. Installation of the “flap switch” signal line ... 288.9.2. Installation of the signal line o

Page 57 - Electrical manual 43

SSE 5 BLElectrical manual 46

Page 58 - Electrical manual 44

SSE 5 BLElectrical manual 47

Page 59 - Electrical manual 45

SSE 5 BLGeneral instructions 1-11. General instructions These instructions apply to all persons within the range of actionof the equipment.These oper

Page 60 - Electrical manual 46

SSE 5 BLGeneral instructions 1-21.1. Warnings and symbolsThe following warnings and symbols are used in these operating instructions: This symbol ind

Page 61 - Electrical manual 47

SSE 5 BLGeneral instructions 1-31.2. Explanations and informationVarious terms and designations are used in these operating instructions to ensure cl

Comments to this Manuals

No comments