Sterling SSE-2 User Manual

Browse online or download User Manual for Welding System Sterling SSE-2. Sterling SSE-2 User's Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 58
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Ope ra ting In struc tions
Sing le Con vey or Unit
SSE-2
516-4MS
Ster ling Ma te rial Pro cess ing
P/N 882.00608.00
Page view 0
1 2 3 4 5 6 ... 57 58

Summary of Contents

Page 1 - Sing le Con vey or Unit

Ope ra ting In struc tionsSing le Con vey or Unit SSE-2516-4MSSter ling Ma te rial Pro cess ingP/N 882.00608.00

Page 2

2. Sa fe ty in struc tions»The se sa fe ty in struc tions ap ply to all per sons wit hin the ran ge of ac ti on of the equip ment.Plea se in for

Page 3

2.1. For your sa fe tyGe ne ralThe ope ra ting per son nel of this equip ment must be at least 16 ye ars old.Plea se read the se ope ra ting

Page 4

As sem blyCom pa re the con nec ted lo ads with tho se of the mains supp ly. Dan ger of in ju ry through elec tri calshock!When using lif ting

Page 5 - Tab le of con tents

Ope ra ti onAp point an equip ment fo re man to be re spon si ble for the equip ment.En su re that the ope ra ting per son nel are pro vi ded

Page 6

2.2. For the ope ra ting sa fe ty of the equip mentNe ver chan ge set tings if the con se quen ces are not pre ci se ly known.Use only ori gi

Page 7 - 1. Gener al in struc tions

3. Put ting into ope ra ti on»This chap ter is in ten ded for ope ra ting per son nel.Pre re qui si te for this chap ter is ge ne ral kn

Page 8 - Gener al in struc tions 1-2

3.1. Chec king the pipe sys temRe mo ve the fle xi ble hose from the con nec ted ma te ri al ta keup.Clo se the open end of the hose with your hand.

Page 9

3.2. Ad ju sting the suc ti on pi pesThe suc ti on pi pes have to be ad jus ted ex act ly to en su re trou ble free ope ra ti on.1. Set the suc

Page 10 - 2. Sa fe ty in struc tions

3.3. Set ting the con trol lerFThe fil ling ca pa ci ty of the hop per loa der may not ex ceed the ma te ri al in -let.&The set ting i

Page 11 - Sa fe ty in struc tions 2-2

Set ting the line cle ar timePress the “chan ge-over” key and then the “ar row key”.&The line cle ar time which was last se lec ted ap pe ars

Page 12 - Sa fe ty in struc tions 2-3

Tech ni cal ser vi ce:Ser vice de part mentTele phone: (800) 423-3183Edi ti on: 07/02 Con fir ma tion num ber: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Page 13 - Sa fe ty in struc tions 2-4

4. Er ror and er ror cor rec ti on»This chap ter is in ten ded for the ope ra ting per son nel of the equip ment.Pre re qui si te for this ch

Page 14 - Sa fe ty in struc tions 2-5

If a dis tur ban ce oc curs in the unit, an alarm mes sa ge will be is su ed (op ti on, only if the alarm in di -ca ting de vi ce has been ac t

Page 15

“E2" If the con trol sys tem be comes too hot dur ing op er a tion (>70°C, 158°F) the “E2" alarm mes sage isdis played and the unit is sw

Page 16

5. Ma in ten an ceThis chap ter is in ten ded for per sons with skills in elec tri cal and me cha ni calare as due to their trai ning, ex pe r

Page 17

FPlea se ob ser ve the main ten an ce in ter vals.Be fo re star ting main ten an ce work, cle an the equip ment of oil, fuel or lu -bri cants.En

Page 18

5.1. Main ten an ce in ter valsDai ly: Check war ning signs on equip ment for good le gi bi li ty and com ple te nessCle an the sie ve / fil ter

Page 19 - 3.5. Swit ching off the unit

5.2.1. Chan ging the sea ling ring of the out let flapOpen the tog gle-type fa ste ners (A) andthe flap (B) of the hop per loa der.Draw the old sea

Page 20

5.2.2. Ad ju sting the flap switchRe mo ve the con nec ting plug “flap switch”from the con nec ti on hou sing of the hop -per.Con nect an ohm me ter

Page 21

5.2.3. Clea ning the unitOpen the ten si on ring.Fold the tur bi ne head up wards.Re mo ve the sie ve.Cle an the sie ve by me ans of com pres se

Page 22 - “E2"

Open the tog gle-type fa ste ners (A) andthe flap (B) of the hop per loa der.Check the fil ter cloth (C) and the wire cloth(D) for ma te ri al r

Page 23 - 5. Ma in ten an ce

Ster ling Ma te rial Pro cess ing re tains all rights to chan ge the in for ma ti on in the seope ra ting in struc tions at any time wit hout no

Page 24 - Ma in ten an ce 5-2

5.3. Re pla cing car bon brus hes at tur bi ne»This work must be car ried out by qua li fied per son nel only.Dis con nect the unit from mains

Page 25 - Ma in ten an ce 5-3

FOb ser ve that no ca bles will be squee zed.Car bon brus hes can be re pla ced twi ce. Af ter that the tur bi ne has to be com ple te ly r

Page 26 - Ma in ten an ce 5-4

6. Functio nal des crip ti on»This functio nal des crip ti on is in ten ded for all ope ra ting per son nel of theequip ment.Pre re qui si te

Page 27 - Ma in ten an ce 5-5

6.1. Ge ne ralThe sing le con vey or unit functions ac cor -ding to the prin ci ple of suc ti on con vey an ce. A high-per for man ce tur bi n

Page 28 - Ma in ten an ce 5-6

6.2. Con trol lerThe con trol sys tem is moun ted on the se pa ra tor lid.The set ting for the con vey ing time and the line cle ar time are made

Page 29 - Ma in ten an ce 5-7

Op tio nal:If a ma te ri al clea ring val ve has been in stal led re si du es of flo wing ma te ri al will be clea ned from thecon vey in

Page 30 - Ma in ten an ce 5-8

7. Tran sport, As sem bly and Sto ra ge»This chap ter is in ten ded for all ope ra ting per son nel of the equip ment.Per son nel using the se

Page 31 - Ma in ten an ce 5-9

7.1. Tran sport and Pac king»Plea se en su re ade qua te car ry ing ca pa ci ty of the lif ting equip ment.The equip ment pass a ri go rous

Page 32

8. As sem bly in struc tions»The se in stal la ti on in struc tions are in ten ded for per sons with skills in elec tri -cal and me cha ni ca

Page 33 - 6.1. Ge ne ral

8.1. As sem blyThe sing le con vey or unit is in sen si ti ve to shocks and can be moun ted di rect ly onto the pro ces singma chi ne, on a ma

Page 34 - 6.2. Con trol ler

Please note that our address and phone information has changed. Please reference this page for updated contact information. These manuals are obsolet

Page 35

Moun ting on fi xed ma chi ne thro ats or in ter me di ate con tai ners is done by me ans of strap re tai -ners.Plea se check du ring as sem

Page 36

8.2. Moun ting on the pro ces sing ma chi neA ma te ri al hop per VT 1,0 is re qui red:Mount the material hop per onto the flan ge of the pro -ce

Page 37 - 7.3. Sto ra ge

8.4. Moun ting onto mi xing hop pers with la te ral in letA ma te ri al hop per VT 1,0 is re qui red:Mount the ma te ri al hop per onto t

Page 38 - 8. As sem bly in struc tions

8.6. Mate ri al feedSuc ti on pi pes type MV may be til ted by ap prox. 45 de grees in eit her di rec ti on to the ver ti cal. Ad di -tio nal f

Page 39 - 8.1. As sem bly

8.8. Pi pe workIf PVC ho ses are used for con vey ing, they must be groun ded: draw out the cop per lead on bothends of the hose and jam it

Page 40 - As sem bly

8.9.1. In stal la ti on of the “flap switch” sig nal lineIn sert the ap pli an ce plug of the “flap switch” sig nal line into the “flap switch

Page 41

8.9.3. In stal la ti on of the alarm in di ca ting de vi ce (op tio nal)»This work must be car ried out by qua li fied per son nel only.Di

Page 42

8.10. Com pres sed-air supp ly (only SSE-2 with ac ti ve clea ning)For ope ra ting the clea ning de vi ce, a com pres sed-air supp ly is ne ce

Page 43 - 8.6. Mate ri al feed

9. Tech ni cal data»The se in struc tions ap ply to all per sons wit hin the ran ge of ac ti on of the equip -ment.The se ope ra ting in struc t

Page 44 - 8.8. Pi pe work

SSE-2Ba sic Ver si on• In te gra ted con trol with:- LED-dis play- in di ca ti on of the re spec ti ve mo des of ope ra ti on - ad jus tab le

Page 45 - B A

Tab le of con tents1. Ge ne ral in struc tions ...1-11.1. War nings and sym bols...

Page 46

Di men si on Sheet516-4MSSSE-2Tech ni cal data 9-3Di men sions and data wit hout ob li ga ti on. Di men sions in mm. Spe ci fi ca tions may be

Page 47

10. Spa re parts list»This spa re parts list is in ten ded to be used only by trai ned per son nel.Ot her per sons are not per mit ted to mo di

Page 48 - 9. Tech ni cal data

SSE-2, 230 V, 50 Hz / 110 V, 60 Hz516-4MSSSE-2Spa re parts list 10-2

Page 49

10.1. SSE-2, 230 V, 50 HzPos. Or der no. De sig na ti on Wear Code1 37767 Tur bi ne head com ple te, with tur bi ne and controller2 37765 Co ver

Page 50 - Tech ni cal data 9-3

10.2. SSE-2, 110 V, 60 HzPos. Or der no. De sig na ti on Wear Code1 37777 Tur bi ne head com ple te, with tur bi ne and con trol ler2 37765 Co v

Page 51 - 10. Spa re parts list

10.3. SSE-2, 230 V, 50 Hz with ac ti ve cleaningPos. Or der no. De sig na ti on Wear Code1 37755 Fil ter with sea ling A2 37222 Basket3 82593 So

Page 52 - Spa re parts list 10-2

10.5. Ac ces so riesFPlea se ob ser ve the ope ra ting ma nu als in chap ter 11.516-4MSSSE-2Spa re parts list 10-6

Page 53 - Spa re parts list 10-3

11. Ac ces so rieso _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _o _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Page 54 - Spa re parts list 10-4

12. Elec tri cal ma nu al»This elec tri cal ma nu al is in ten ded to be used only by Ster ling ser vi ce per son -nel and trai ned per son ne

Page 55 - Spa re parts list 10-5

8. As sem bly in struc tions ...8-18.1. As sem bly...

Page 56 - Spa re parts list 10-6

1. Gener al in struc tions»The se in struc tions ap ply to all per sons wit hin the ran ge of ac ti on of the equip -ment.The se ope ra ting in

Page 57 - 11. Ac ces so ries

1.1. War nings and sym bolsThe fol lo wing war nings and sym bols are used in the se ope ra ting in struc tions:»This sym bol in di ca tes da

Page 58 - 12. Elec tri cal ma nu al

1.2. Ex pla na tions and in for ma ti onVa ri ous terms and de sig na tions are used in the se ope ra ting in struc tions to en su re cla ri t

Comments to this Manuals

No comments